PARQ Residence – Upcoming Apartment Building is a 32-story residential project set to commence construction in September 2023. The project aims to be completed by the end of 2027.
Units under 1000 sqft – 1 car park, dual key units- 2 car parks, 4-bedroom units – 3 car parks, and penthouse units – 4 car parks.
Unit Type:
- Type 1: 1227 sq.ft. (4 Bedrooms 3 Bathrooms)
- Type 2: 873 sq.ft. (3 Bedrooms 2 Bathrooms)
- Type 3: 775 sq.ft. (2 Bedrooms 2 Bathrooms)
- Type 4: 1217 sq.ft. (3 Bedrooms 3 Bathrooms)
- Type 5: 1265 sq.ft. (4 Bedrooms 3 Bathrooms)
- Type 6: 978 sq.ft. (3 Bedrooms 2 Bathrooms)
- Type 7: 994 sq.ft. (3 Bedrooms 2 Bathrooms)
- Type 8: 976 sq.ft. (3 Bedrooms 2 Bathrooms)
- Type 9: 1469 sq.ft. (4 Bedrooms 3 Bathrooms)
- Type 10 (Penthouse): 2498 sq.ft. (4 Bedrooms 4 Bathrooms)
Situated in the heart of Kuching and enjoys a prime location. The Kuching City South (MBKS) City Hall is conveniently accessible on foot, Additionally, within a 3-kilometer radius, one can find an array of 10 primary and secondary schools, 6 prominent banks, a diverse selection of hotels, as well as a multitude of restaurants and shops, creating a vibrant and convenient living environment.